Technology Access Fees Database

Front End Search: View

385
Yes
ME
2002

Contact Information

Watson Hannah
whannah@mtsu.edu
N/A
RIM
Infrastructure
N/A
Replacement of Existing Technology
N/A
N/A
Connect 48 ports (100 Mbps) in Ezell (for Recording Industry studios) via a dedicated 100 Mbps fiber uplink to the high speed Gigabit backbone data network to allow for student access within this building to campus and Internet data resources at high speeds.
36078
36078
N/A
36078
2-14700
N/A
N/A
1
Purchase and install fiber optics and termination ($17,108), copper wiring ($7,200), conduit in concrete ($7,770) and network electronics (VH4802 SM, fiber uplink, and extended warranty through 8/2004 ($4,000)
36078.00
36078.00
N/A
N/A
N/A
N/A
N/A