Technology Access Fees Database

Front End Search: View

901
Yes
Liberal Arts
2008

Contact Information

Tom Nolan
tnolan@mtsu.edu
Dean John McDaniel
College of Liberal Arts and Department of Geosciences
Smart Classroom
KOM 308
N/A
N/A
189350.63
Geosciences uses KOM 308 for the following classes: GIS, Advanced GIS, Remote Sensing, Cartography, Image Interpretation, and Computer Field Methods in Geology. These classes require specialized software unavailable in other student computer classrooms. Demand for these classes is high. For example, GIS is required for Geosciences, Anthropology, Environment Science, and Outdoor Recreation and also attracts students from History, Biology and Aerospace. GIS is full every semester. During 2007-2008, over half of the available 18 seats per semester went to non Geosciences majors. In the past, we accommodated students who required the course for graduation but were unable to register by overbooking beyond the 18 seat capacity. However, to comply with various codes, the maximum seat capacity of KOM 308 has been reduced by four students. In order to comply with codes and serve our students, we propose enlarging KOM 308 by removing an internal partition and reconfiguring the room as a master computer classroom with a maximum student capacity of 20. Additionally, the classroom reconfiguration encourages teaching of GIS with more collaborative instructional methods utilizing flat panel displays and provides more faculty control over the student computer. This is a joint proposal from the College of Liberal Arts and Geosciences.
149400
149400
189323.44
-39923.44
214700
8831712, 9123509, 9626693, ITD
6849, 7033, 7374
1
Standard Master Classroom
35000.00
35000.00
65021.00
8897915
6892
1
Copy Cam White Board
5000.00
5000.00
2562.99
8831712, 9354403, ITD
N/A
8
Flat Panel Display
3000.00
24000.00
304.00
9105979
7038
7
GIS computer workstations
1200.00
8400.00
7465.36
N/A
N/A
1
30 seat Imagine software lab kit
5000.00
5000.00
N/A
9113560
7029
2
Color Laser Printers
1000.00
2000.00
3243.00
SPSP080241
N/A
1
Construction Costs
60000.00
60000.00
80376.36
9123305, 9546749, 9746159
N/A
1
Collaborative and other software
10000.00
10000.00
30377.92
Yes
Yes
No
N/A