 1 Bank Stabilization  Shelia Knight  $1.200
2 Water Bottle Refill Station  Todd Wyant  $1,200
 3 Mechatronics Lab LED Retrofit VET 118  John Rozell  $1,850
4 40 Volt Lithium-Ion Battery Operated Grounds Equipment  Jason Young  $2,500
 5   Dehumidifier LRC 101  Les Mayberry  $2,500
6 Bring Green Chemistry to Campus IV  Dr. Keying Ding  $3,017
 7 Synthetic Pocket Media FIlters Peck Hall  Les Mayberry  $3,905
8 KOM Hand Dryers  Rashad Taylor  $4,052
 9 Biotech Applications for Biofuels Industry  Melissa Shelby  $4,820
10 Bank Stabilization  Shelia Knight  $5,000
 11 Bottle Filler Water Fountains - Will Hastings & Midgett  Percy Pulido  $5,600
12 Automatic Flush Valves & Sink Sensors  Todd Wyant  $6,000
 13 Tree Planting Project  Jason Young  $6,000
14 Water Refill Stations - Stark Ag, Mass Comm, Cason Kennedy  Selana Ranney  $6,132
 15 BTU Meter Installation - New Science Building  Alan Parker  $6,429
16 Camfil Farr Pleated Filters - 6 Buildings  Les Mayberry  $6,500
 17 10 HP variable Frequency Drive - Walker Library (Phase 3 of 3)  Reggie Floyd  $6,700
18 Ramp Lights at MTSU Airport - Lanier  Barry Roggenkamp  $7,200
 19 16 HP Variable Frequency Drive - Walker LIbrary (Phase 2 of 3)  Reggie Floyd  $7,200
20 Insulate PIpes Multiple Buildings and Areas  Les Mayberry  $8,100
 21 Airflow Station Installation - Cummings  Alan Parker  $9,000
22 Neighborhood Electric Vehicle (NEV) Technology  John Rozell  $9,000
 23 Bypass Feeders - 15 Buildings  Reggie Floyd  $9,800
24 Closed Loop Air & Sediment Filtering System - Miller Education Cneter  Donnell Thompson  $10,000
 25 Propane Mower  Rashad Taylor  $11,178
26 50 HP Variable Frequency Drive - Walker Library (Phase 1 of 3)  Reggie Floyd  $11,354
 27 BDA Water Refill Stations  Christopher Bearden  $12,000
28 Solar Shack Remodel  Melissa Shelby  $13,000
 29 Air Flow Installation - Corlew   Alan Parker  $15,125
30 Satelllite Chilled Water Plant Energy Study  Alan Parker  $17,066
 31 Big Belly Solar Trash Compactors - 3  Selana Ranney  $17,667
32 Student Athlete Enhancement Center Study Carrell Replacement  Todd Wyant  $20,000
 33 Luminis 5 Upgrade Project  Brian Holley  $25,000
 34 LED Light Replacement - Rec Center Gym & Indoor Arena  Ray Wiley  $58,508
  TOTAL    $334,603